- Joined
- Dec 25, 2018
- Messages
- 165
- Likes
- 224
G2 look will be 100% the same as G1. Regarding the order, probably you can pay right now but we can ship stuff next few days anyway.
9038D is pretty much ready but I try to implement there stealth volume control, and now I try to decide:
a) fast release without volume control
b) late release with volume control
9038D housing extrusion is ordered, and today will pass to the CNC facility and anodize. Side caps punch tolling ordered too, I got samples this morning. I have to prepare new giftbox design and order bunch of 9083D giftbox.
Ok, probably better to wait a little and have the volume control. Planning to get both 9038D and 9038SG2. I don't mind waiting. If you can put the 9038D as pre-order I'll place an order as soon as possible.