And A6B?C6B needs to more wait.
Driver supplying needs long lead time these days.
Thanks
And A6B?C6B needs to more wait.
Driver supplying needs long lead time these days.
Purifi needs more lead time..And A6B?
Thanks
You can push them over 90dB too.Is there a chance that the S6C might be enough for full range playback in a small 4x4m room at around 70db average listening level when placed directly at front wall with acceptable distortion?
If yes that’s gonna be my endgame speaker.
Thanks for the update, I'll be waitingPurifi needs more lead time..
By the way We expect S6B will be available in this year.
What about the C6C?By the way We expect S6B will be available in this year.
Audiophonics has their restock listed as the first week of November. If that gives you an idea for time frame.@AsciLab Great! any updates on the c6b?
Awesome. Was about to buy some Kef reference 3 meta but might rather go with the S6C for the cardioid dispersion if it will be similar to the C6C but with a little more bass extension and lower bass distortion.You can push them over 90dB too.
You are more than enthusiastic with these speakers, not?Speaking purely personally if out of warranty parts were needed they would only be at my cost.
Having said that I wouldn’t expect anything to fail in normal use.
Keith
You are more than enthusiastic with these speakers, not?
when should we expect US distribution channels for purchase vs direct from Ascilab + tariff cost?
Isn't S360 refined enough? Don't think ASCILabs could come up with a better price too.Would like to see an optimized AsciLab design with the dynamic capabilities similar to the S360. Please.
CJH
Vertical directivity has strong cancellations and the resulting listening windowd for optimal direct sound is very narrow on the S360.Isn't S360 refined enough? Don't think ASCILabs could come up with a better price too.
No offence to the company, I think you're doing great things.
Our pre-order is being manufactured and should be ready in a couple of weeks for shipment. Then it will be a slow journey across the ocean (about 4 weeks). And some unknown customs processing, etc. So best case is end of October but likely, early November.when should we expect US distribution channels for purchase vs direct from Ascilab + tariff cost?